Basic Information
| Model NO. | HONYO |
| Structure | Conveyor System |
| Material | Stainless Steel |
| Application | Grain, Mining, Power, Food Industry |
| Core Components | Bearing, Motor, Gear |
| Automation | High Automation |
| Hygiene Standard | Food Grade |
| Origin | China |
Product Description
Comprehensive Meat Deboning and Cutting Production Lines
Our integrated deboning and cutting solutions are designed to meet the diverse processing requirements of pork, beef, mutton, poultry, and aquatic products. Each production line combines advanced equipment, ergonomic design, and streamlined workflows to ensure food safety, maximize yield, and improve operational efficiency.
Company Profile
CNHONOR Group comprises Huayu Mechanical Equipment (Branded as HONYO) and Aonaer Refrigeration (Branded as CNHONOR), providing comprehensive, end-to-end solutions—from design and engineering to installation and after-sales support—for the meat slaughtering, processing, and food industries. Having successfully completed 3,000+ domestic and 60+ international projects, the group possesses extensive expertise in project management and execution.
Certifications
Exhibition
FAQ
1. Which product should I choose?
The appropriate equipment depends on factors such as the type of product, production volume, and workshop size. Please provide us with these details, and our team will tailor a recommendation.
2. What materials are used in the product?
Our equipment is constructed from 304 stainless steel for durability and corrosion resistance, while the evaporator features aluminum alloy for efficient cooling.
3. What certifications do you have?
We are certified to ISO 9001, ISO 14001, and ISO 45001, ensuring compliance with quality, safety, and environmental management. Our products also comply with CE and HACCP requirements.
4. Where can I see your product display?
Our products are showcased on our website. If you would like to see the equipment in operation, we can arrange a visit to a client's facility or provide a virtual tour upon request.
5. What is the operation process?
Our equipment is user-friendly, supported by a clear user manual and on-site training after installation. We also provide ongoing support to ensure smooth and reliable operation.
6. How do you guarantee the quality?
Production is carried out strictly by finalized drawings, with stringent quality inspections at every stage. Each machine is tested under realistic conditions for 5–7 days before delivery.